Compliance, without the guesswork

Practical guides for general contractors on subcontractor compliance, licence verification, and keeping a site audit-ready.

Project Delivery · Operations

What a kiosk sign-in actually proves — and what it doesn't

A QR scan at 7am proves a subbie was on site at 7am. It says nothing about the other eight hours of the shift — and on a job where that gap matters, a sign-in sheet and an empty site can look identical.

1 September 2026 · 4 min read

More guides
Business Operations

How small Principal Contractors run a tighter business

Five specific things to actually change this week, not five things to think about, a subbie checklist, a claim-response habit, a weekly number to check, and where to draw the line on what still needs to be you.

30 August 2026 · 6 min read

Project Delivery · Operations

A defect texted to a subcontractor vs. one that's tracked: what happens after handover

A defect noted on a walkthrough and texted to whoever's responsible works fine right up until the defects liability period, when nobody can agree on when it was raised, who was told, or whether it was ever actually fixed.

28 August 2026 · 5 min read

How to verify a subcontractor’s licence in WA (why DEMIRS can’t be automated like QBCC)
Licensing

How to verify a subcontractor’s licence in WA (why DEMIRS can’t be automated like QBCC)

Western Australia doesn’t publish an open, queryable licence dataset the way QLD and NSW do — DEMIRS’ Online Licence Search is a manual, one-at-a-time lookup with no bulk data behind it. Here’s what that actually means for checking a subcontractor’s licence.

23 August 2026 · 5 min read

An RFI by email vs. one with a timestamp: what actually goes missing
Project Delivery · Operations

An RFI by email vs. one with a timestamp: what actually goes missing

A Request for Information sent by email works fine right up until you need to prove when it was asked, who answered, and what they actually said — which is usually exactly the moment it matters most.

20 August 2026 · 5 min read

Payments · Operations

What a disputed subcontractor payment claim actually costs a Principal Contractor

A rejected claim with no reason attached doesn’t end the dispute — it just moves it to a phone call, then an email chain, then a resubmission nobody can point to. Here’s where that time actually goes, and what a paper trail changes about it.

19 August 2026 · 6 min read

Compliance

Payday Super and subcontractors: what general contractors actually owe

From 1 July 2026, super has to be paid every payday, not quarterly — and it doesn’t stop at your direct employees. Here’s the subcontractor test most Principal Contractors have never had to think about.

12 August 2026 · 6 min read

Asbestos · Compliance

Asbestos register basics: what general contractors actually need on file

A pre-2004 building, or one where the construction year isn’t even known, needs a real asbestos register before work starts — not a PDF someone half-remembers uploading. Here’s what has to be on it, and where it should come from.

5 August 2026 · 4 min read

Licensing

How to verify a subcontractor’s licence in QLD (the QBCC register explained)

A practical walkthrough of verifying trade licences against the QBCC open register — what it actually covers, the one thing that trips up a manual check, and how to avoid the admin that usually falls through the cracks.

5 August 2026 · 6 min read

SWMS · Compliance

SWMS vs. JSA: what’s the difference, and which one do you actually need?

Confusing a Safe Work Method Statement with a Job Safety Analysis — or handing over a JSA when a SWMS is legally required — can get a site shut down on the spot. Here’s how to tell them apart.

2 August 2026 · 7 min read

WHS · Subcontractors

Does a subcontractor bringing their own crew need a worker-management agreement?

When a subcontractor brings their own tradies onto your site, WHS due diligence doesn’t stop at their own paperwork — here’s what a worker-management responsibility agreement actually covers, and when you need one.

1 August 2026 · 5 min read

Licensing

How to verify a subcontractor’s licence in NSW (without waiting on hold)

A practical walkthrough of verifying trade licences against the NSW government register — what to check, how often, and how to avoid the manual admin that usually falls through the cracks.

20 July 2026 · 6 min read

Site Induction

White Card compliance tracking: what general contractors actually need to get right

White Card (General Construction Induction) requirements are simple in principle and surprisingly easy to get wrong in practice across a large or fast-moving job. Here’s what trips people up.

10 July 2026 · 5 min read

Licensing

How to verify a subcontractor’s electrical licence in Victoria (REC vs. individual licences explained)

Victoria splits electrical licensing into two genuinely different things — a business registration and an individual worker’s licence — and checking one doesn’t tell you anything about the other. Here’s how the Energy Safe Victoria register actually works.

25 May 2026 · 6 min read

Compliance

Why insurance certificates need their own tracking, not just licences

A trade licence expiring and a public liability certificate expiring are two completely separate failure modes — treating insurance as a footnote to licence tracking means one of them is quietly going unmonitored.

18 May 2026 · 5 min read

Licensing

SA’s Building Indemnity Insurance changes: what Principal Contractors engaging SA subcontractors need to know

From 10 November 2025, South Australia’s minimum Building Indemnity Insurance cover rose from $150,000 to $250,000, and the domestic work threshold that triggers the requirement rose from $12,000 to $20,000. Here’s what actually changed and who it affects.

11 May 2026 · 5 min read

SWMS · Compliance

Why your SWMS template citing "WHS Regulation 2011" is wrong in Victoria

Victoria never adopted the model WHS laws every other harmonised state and territory runs on — a SWMS template built around Schedule 2 of the WHS Regulation 2011 is citing the wrong law entirely for a Victorian site.

4 May 2026 · 5 min read

WHS · Subcontractors

When your regular subcontractor can’t show up: the compliance problem nobody plans for

A subcontractor calling in a same-day replacement is normal on a construction site — and it quietly breaks every compliance check you already did for the person who was actually supposed to turn up.

27 April 2026 · 5 min read

WHS

Psychosocial hazard reporting on construction sites: what Principal Contractors are actually required to do

Bullying, excessive workload, and fatigue are WHS hazards now, under the same duty of care as a fall risk — most sites still have no real channel for reporting them. Here’s what’s actually required, and why anonymity is the part that makes it work.

20 April 2026 · 5 min read